Schiedel GmbH News
Contractors working on data centre construction are being warned about a costly oversight that could lead to downtime and costly remedial work, according to a new sector report. The concern is being raised around incorrectly designed and installed flying for backup generators leading to overheating and system failure during grid outages. Critical infrastructure malfunction-related downtime may not only lead to steep penalties for data centre operators but also reputational damage for the c...
Browse security news
Dahua Smart Dual Illumination Active Deterrence Network PTZ Camera
Hikvision DS-K6B630TX: Smart Pro Swing Barrier for Modern Access Control
Climax Mobile Lite: Advanced Personal Emergency Response System (PERS)
One system, one card
DownloadAligning physical and cyber defence for total protection
DownloadUnderstanding AI-powered video analytics
DownloadEnhancing physical access control using a self-service model
DownloadHow to implement a physical security strategy with privacy in mind
Download